[1]
“Minimizing the Lateness, Makespan, And Energy Efficient Factors in Job Shop Scheduling”, TURCOMAT, vol. 12, no. 10, pp. 5805–5816, Apr. 2021, doi: 10.17762/turcomat.v12i10.5395.